BWTS installation heavy lift vessel

UniBallast has recently finalized a ballast water treatment installation on board a heavy lift vessel.

UniBallast's scope of work consisted of full basic and detailed engineering of an intermediate platform, supports and foundations for equipment, piping, etc. Plus assisting client in the selection process of the BWT-system and providing an on-site construction manager for the installation and integration on board.

Installation and integration went well and the BWT-system has been commissioned successfully.

Tags:
bwts, installation, heavyliftvessel, engineering, uniballast